Interactive 3D Installation Guide
Mastering the Access Floor
Installation
Experience the precision and structural integrity of Profloortech's premium raised floor systems. Interact with our true 3D guide to understand pedestals, stringers, and panels.
Installation Sequence
Clean the ground
Carefully check the flatness of the ground and the verticality of the wall.
Painting the gridlines
Pull the horizontal line and use the ink line to hit the wall surface. Eject the gridlines on the ground.
Place the pedestals
Place the pedestals at the intersection of the ground gridlines, fixed the pedestal base with glue.
Adjust the level
Use the infrared ray level instrument to confirm the height of pedestals is the same.
Connect the stringers
Fix the stringers to the pedestals with screws and make them perpendicular to each other.
Place the panel
Use the lifter to place the floor on the assembled stringers. Ensure aligned edges.
Do step and wall edge trim
Cover the gap between the floor and the wall with the baseboard or stair nosing.
Clean up the floor
Final inspection and cleaning of the newly installed raised access floor.
Ready to Source Smarter?
Need a Custom Raised Floor Solution?
Profloortech is a leading manufacturer of top-tier access floor systems. From detailed design to global supply, we guarantee unmatched quality and structural precision.
Respond within 24 hours · WhatsApp & Email welcome
CISCA / CE Certified
Factory load-bearing tests on every batch, documentation ready for project acceptance.
OEM / ODM Ready
Custom dimensions, density, branding & packaging -- full white-label production capability.
Global Logistics
FOB / CIF / DDP. Container-optimized loading plans cut your freight cost per m².
© 2026 Profloortech · Changzhou, Jiangsu, China · Specialist in Raised Floor, Access Floor, and False Flooring systems