ProFloorTech



Interactive 3D Installation Guide

Mastering the Access Floor
Installation

Experience the precision and structural integrity of Profloortech's premium raised floor systems. Interact with our true 3D guide to understand pedestals, stringers, and panels.

Installation Sequence

1

Clean the ground

Carefully check the flatness of the ground and the verticality of the wall.

2

Painting the gridlines

Pull the horizontal line and use the ink line to hit the wall surface. Eject the gridlines on the ground.

3

Place the pedestals

Place the pedestals at the intersection of the ground gridlines, fixed the pedestal base with glue.

4

Adjust the level

Use the infrared ray level instrument to confirm the height of pedestals is the same.

5

Connect the stringers

Fix the stringers to the pedestals with screws and make them perpendicular to each other.

6

Place the panel

Use the lifter to place the floor on the assembled stringers. Ensure aligned edges.

7

Do step and wall edge trim

Cover the gap between the floor and the wall with the baseboard or stair nosing.

8

Clean up the floor

Final inspection and cleaning of the newly installed raised access floor.



Ready to Source Smarter?

Need a Custom Raised Floor Solution?

Profloortech is a leading manufacturer of top-tier access floor systems. From detailed design to global supply, we guarantee unmatched quality and structural precision.

Respond within 24 hours · WhatsApp & Email welcome

CISCA / CE Certified

Factory load-bearing tests on every batch, documentation ready for project acceptance.

OEM / ODM Ready

Custom dimensions, density, branding & packaging -- full white-label production capability.

Global Logistics

FOB / CIF / DDP. Container-optimized loading plans cut your freight cost per m².

© 2026 Profloortech · Changzhou, Jiangsu, China · Specialist in Raised Floor, Access Floor, and False Flooring systems